What happens after you place an order

From deposit to delivered container: the stages, the checkpoints and the documents you receive at each one. No black box between payment and shipment.

See Customisation
25–35 day productionWeekly photo updatesIn-line + pre-shipment QCFOB / CIF / DDP
Order flow

Eight stages, one container

Every order follows the same sequence. The numbers below are working days counted from the day the deposit clears.

01

Order confirmation & deposit

We issue a proforma invoice with the locked specification sheet attached. Production is scheduled once the deposit arrives and the specification is signed off.

  • Spec sheet: dimensions, material, finish, logo and packing
  • PI stating payment terms, lead time and shipping term
02

Material preparation

Wood is purchased to the agreed grade, kiln-dried and acclimatised to the workshop. Moisture content is checked before cutting so panels do not move after assembly.

  • Moisture content controlled to 8–12%
  • Material batch recorded for reorders
03

Cutting & machining

Panels are cut, drilled and profiled on CNC lines. Parts are checked against the drawing before they move to assembly.

  • CNC cutting, drilling and edge profiling
  • First-article check on every new run
04

Assembly & sanding

Joints, hinges and hardware are fitted, then every surface is sanded in stages. Sharp edges and glue lines are removed before finishing.

  • Hardware pull-tested on sample pieces
  • Sanding to 180–240 grit before finish
05

Finishing & branding

Oil, stain or lacquer is applied and cured, then the logo is engraved, stamped or printed. Colour and grain are matched across the whole batch at this stage.

  • Food-safe oil or water-based lacquer
  • Laser, hot stamping, screen or UV print
06

Quality inspection

In-line checks run during production, then a full pre-shipment inspection against the approved sample once the batch is complete.

  • AQL-based sampling on request
  • Photo report issued before packing
07

Packing & marking

Products are wrapped, protected and packed to the agreed method, then labelled with your carton marks, barcodes or retail labels.

  • Inner protection: foam, EVA, tissue or bubble wrap
  • Export cartons, pallets or wooden crates
08

Loading & shipping

We book the space, supervise loading and hand over the full document set. Loading photos are sent before the container leaves.

  • EXW, FOB, CIF or DDP
  • Sea, air or express depending on urgency
In production

Six operations on our own lines

Nothing is subcontracted to an unknown workshop. The same team that cuts the panel finishes it and packs it.

Panel preparation

Selection, kiln drying and acclimatisation. Defects and colour variation are sorted out before cutting.

CNC machining

Cutting, drilling, grooving and edge profiling to the drawing, with first-article approval on every run.

Assembly

Joint fitting, hardware installation and glue-up, with squareness checked on every batch.

Sanding

Multi-stage sanding removes machining marks, burn marks and raised grain before any finish is applied.

Finishing

Oil, stain, paint or lacquer applied and cured in a controlled area, with colour matched to the approved sample.

Branding & final assembly

Laser engraving, hot stamping, screen printing or metal plates, then final assembly and accessory packing.

Quality control

Three checkpoints before anything is packed

Inspection is not a final gate we run at the end. It is written into the production schedule at three points.

Incoming material

Moisture, grade, colour and defects are checked when the wood arrives. Rejected boards never reach the saw.

In-line production

Dimensions, joint strength and surface quality are checked during and after each operation, not only at the end.

Pre-shipment

A full inspection against the approved sample: structure, finish, logo, quantity and packing condition. A photo report is issued before the cartons close.

In-line inspection on the finishing line
In-line inspection on the finishing line
Packing

Packing built around the product, not the carton

Wooden products arrive damaged for one reason: the packing was designed for a different product. We plan protection first and carton size second.

Inner protection

Foam, EVA inserts, tissue paper, bubble wrap or corner protectors, chosen per item and per surface finish.

Retail packaging

Printed boxes, sleeves, hang tags and barcodes for retail or e-commerce channels, prepared to your artwork.

Export cartons

Double-wall cartons sized to the product, with weight limits and stacking strength checked for sea freight.

Pallets & crates

Palletised or crated loading for heavy or fragile items, with corner protection and strap fixing.

Marks & labels

Shipping marks, side labels, barcodes and FBA labels applied to your specification.

Loading plan

A container loading plan is prepared in advance so volume is used properly and nothing is crushed in transit.

Packing built around the product, not the carton
Packing built around the product, not the carton
Shipping

Terms, modes and documents

Tell us how you buy and we quote on that basis. We ship to North America, Europe, Australia and the Middle East every month.

EXW

You collect from our factory with your own forwarder. Lowest unit price, most control on your side.

FOB

We handle export clearance and deliver to the loading port. The most common term for container orders.

CIF

We cover sea freight and insurance to your destination port.

DDP

Delivered with duty paid, for buyers who want one landed price. Availability depends on destination and product.

Sea freight

The default for bulk orders. Full container or LCL consolidation, 25–40 days depending on the route.

Air & express

For samples, urgent restocks and small orders. 5–10 days door to door at a higher cost per kilogram.

Lead time

Realistic dates, stated up front

Counted in working days from the deposit and the signed specification. Peak season, August to November, adds about one week.

5–7days for samples
25–35days for bulk production
25–40days of sea transit

Mixed-category orders are scheduled so the slowest item does not hold up the container. If a date slips, you hear it from us before the deadline, not after.

FAQ

Order, packing and shipping questions

When does production start?

Production is scheduled when the deposit clears and the specification sheet is signed. Nothing is cut before both are in place, which is what keeps the bulk order identical to the approved sample.

Will I see the goods before they are packed?

Yes. We send an inspection photo report after the pre-shipment check. You can also appoint a third-party inspection company and we will arrange access and sample selection.

Can you pack for Amazon FBA or retail shelves?

Yes. FBA labels, poly bags with warning text, hang tags, barcodes and retail-ready cartons are all prepared to your artwork and your platform's requirement.

Who handles the export documents?

We issue the commercial invoice, packing list and bill of lading, plus certificates such as FSC, phytosanitary or fumigation where the destination requires them.

Ready to fix a delivery date?

Send the item list and target quantity. We will come back with a costed plan: unit price, packing, lead time and the earliest sailing.

WhatsApp